X
GO

Water School

Archive by tag: dockReturn

Why do you charge a fee to build a dock on the reservoir?

The on-water facility fee to place a dock on a BRA reservoir basically allows the permit holder to build and maintain a permanent structure over BRA property (the lake bed). It also gives the BRA the ability to ensure that the docks that are constructed on the reservoir are safe. The permit fee is not a tax, but a one-time fee.  There are no longer annual fees to maintain a dock on a BRA reservoir.  For an on-water facility permit application, click here.
Read More

If I own lakeside property, can I build a dock on a BRA-owned reservoir?

Lakeside property owners can build docks on a BRA-owned reservoir if they complete an On-Water Facility Permit application and pay the relevant fees for inspection of the facility plans and completed work.  Lake regulations set requirements property owners must meet when building a dock.  Details on these regulations may be found in Section 7 of the BRA regulations.Permit applications may be obtained at each reservoir's office or by going to the appropriate website: Possu...
Read More
Search
Categories

The information provided on this site is intended as background on water within the Brazos River basin. There should be no expectation that this information is all encompassing, complete or in any way examines every aspect of this very complex natural resource.

If you have questions about a post or would like additional information, please contact us or call 888-922-6272.

Tags
potable salinity contract minerals measure rain volume subsidence district map tributary canoe direct re-use algae costs water use watershed water maps possum kingdom oxygen brackish pharmaceuticals agricultural solids ground water sewage appropriation stream system gage smell permit emergency use evaporation flood well industry landscaping organic quality gas inundated recreation contaminants limestone subwatershed monitor aquifer depth inland granbury speaker mitigation water planning use supply insurance fishing mainstem PAM river water supply lake flood pool environmental effluent employment chlorine kayak municipal impound wastewater riverine pollutants lake levels spillway indirect re-use dock corps mgd gate jobs sanitation spring salt habitat water clarity environment Board estuary marsh calcium classification dissolved solids dam hydropower consumption climate flood control lake clarity gulf TCEQ soil filter invasive plants fish kill legislation water plants boating septic system wildlife riparian sediment precipitation wetland drilling mission bottled water streamflow beneficial use water treatment taste treatment fertilizer golden algea surface water water rights storage water cycle anaerobic agriculture golden algae electricity streamflow infection lawn rights biosolids allens creek reservoir septic meta tag fork reservoirs bay conservation chlorides channel main stem E. coli camping planning medicine acre-foot hydrologic cycle authority USGS cfs reservoir hydrilla aerobic subsidence water quality releases acre-feet hunting industrial farming lakes drought hydrology lake level E coli sludge governance electric companies turbidity runoff basin canoeing drinking water watercourse parasite xeriscape wetlands groundwater corps of engineers bed and banks water code