X
GO

System Operation Permit & Conformed 2018 Water Management Plan

← Back to SysOps Home



Click photo to enlarge

In 2004, the BRA filed a water right application with the Texas Commission on Environmental Quality (TCEQ) for what would become known as the System Operation Permit. The application sought to appropriate a distinct water supply that was made available through the coordinated use of the BRA’s Water Supply System. As such, the application was the first of its kind in Texas, and the complex permitting process lasted until 2018.

The System Operation Permit (Water Use Permit 5851) was formally issued by the TCEQ on November 30, 2016, and the TCEQ Executive Director approved the conformed 2018 Water Management Plan (Conformed 2018 WMP), the accompanying Technical Report in support of the Conformed 2018 WMP, associated appendices, and the revised Accounting Plan on April 2, 2018.

The Conformed 2018 WMP and accompanying Technical Report are incorporated into the System Operation Permit and governs the operating principles upon which decisions are made for the diversion, storage, and use of the water appropriated under the Permit. More specifically, the Conformed 2018 WMP guides only the use of the System Operation Permit and does not constrain the use of the BRA’s other water rights.

The Conformed 2018 WMP and associated documents, including a Drought Study, which was required by TCEQ during the permitting process, are available by clicking the links below. Additionally, BRA has developed a timeline of the administrative events that occurred during the permitting process. The 2018 Conformed WMP and Technical Report are lengthy documents including six sections or chapters, 18 appendices, and BRA’s revised accounting plan. Due to the size of the documents, each section has been made available as an individual file to simplify the download process. Click on the blue section links to access each file.

System Operation Permit

Permit 5851 – System Operation Permit

View PDF

Drought Study

Drought Study Final Report

View PDF

TCEQ Letter – April 2, 2018

View PDF

Water Management Plan

Conformed Water Management Plan

View PDF

Exhibit A - D Conformed Water Management Plan

View PDF

Technical Report Supporting the Proposed Water Management Plan

Technical Report Sections
  • Table of Contents and Executive Summary View PDF
  • Section 1 – Introduction View PDF
  • Section 2 – Sources of Supply and Water Rights View PDF
  • Section 3 – Water Supply Contracting View PDF
  • Section 4 – Water Supply Operations View PDF
  • Section 5 – Water Rights Accounting and Reporting View PDF

Appendices

Appendix Files