X
GO

Water School

Why do you charge a fee to build a dock on the reservoir?

The on-water facility fee to place a dock on a BRA reservoir basically allows the permit holder to build and maintain a permanent structure over BRA property (the lake bed). It also gives the BRA the ability to ensure that the docks that are constructed on the reservoir are safe. The permit fee is not a tax, but a one-time fee.  There are no longer annual fees to maintain a dock on a BRA reservoir.  For an on-water facility permit application, click here.

Related

Share

Search
Categories

The information provided on this site is intended as background on water within the Brazos River basin. There should be no expectation that this information is all encompassing, complete or in any way examines every aspect of this very complex natural resource.

If you have questions about a post or would like additional information, please contact us or call 888-922-6272.

Tags
PAM water use wildlife beneficial use releases rights direct re-use sediment environmental electric companies reservoir mainstem authority riparian fish kill water code medicine chlorine flood spring sewage river groundwater climate streamflow contract calcium water treatment anaerobic mitigation classification algae golden algae soil industrial maps planning oxygen xeriscape brackish measure industry lake level water plants water streamflow canoeing supply gulf consumption aquifer fertilizer clarity wetland corps surface water runoff indirect re-use agriculture biosolids permit granbury drinking water mgd pharmaceuticals flood pool estuary E. coli USGS governance hydrologic cycle acre-feet appropriation E coli canoe limestone allens creek reservoir evaporation salt wastewater ground water water supply contaminants minerals bottled water kayak gage fork agricultural TCEQ gate taste effluent dock organic hydropower water clarity lake levels fishing hunting potable channel municipal pollutants gas reservoirs infection environment rain well cfs employment dissolved solids emergency use lawn wetlands possum kingdom water planning camping main stem hydrilla volume marsh use conservation dam precipitation riverine tributary inland depth drilling impound meta tag speaker flood control lake subsidence district bay water cycle quality invasive plants storage turbidity watercourse bed and banks chlorides sanitation monitor filter costs lake golden algea jobs subwatershed solids smell parasite corps of engineers boating landscaping hydrology habitat salinity septic septic system basin watershed farming lakes inundated subsidence acre-foot system drought map water rights legislation treatment spillway electricity Board sludge insurance mission water quality stream aerobic recreation